Box PH 12
Restricted
Contains 167 Results:
Aerial view of fields near the proposed site for the Lugert Irrigation Project, undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Aerial view of fields near the proposed site for the Lugert Irrigation Project, undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Proposed dam site of the Lugert Irrigation Project, which is marked with "x---x" for the proposed dam, undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Photograph of a framed painting of an airplane flying over water. Painting is by Harold McCall. A sign next to the painting reads "This Painting of the Winnie Mae by Harold McCall will be placed with Wiley Post's Plane in the Smithsonian Institution at Washington D.C.", undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Prairie Dog crew at work on the old Rainy Mountain School Reserve. Several people and cows can be seen working in a large field. Carbon Bisulphide was used in treating this prairie dog invested land., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Long soil-saving dam constructed at the Fort Sill Indian School. This stock tank will supply the pasture with water which it formerly did not have., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Fort Sill E.C.W. camp. Tents and wooden structures are visible among the trees in the shot. The tents in this camp are arranged in a semicircle in front of the bath house. The trees are so thick that the camp does not show up well in this picture., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Brush-dam constructed on the Rainy Mountain School Reserve. These dams are constructed with mesquite brush and tops. The larger poles are secured along the creek where clearing has been done., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Completed log-dam. Strong anchorage to dead-man is visible on the left. Earth filled in on upper side of completed dam., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Log-dam under construction. A single row of logs, planted well back into solid earth with walls on each side of the gully. Three men are visible working on the dam., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.