Box PH 11
Restricted
Contains 183 Results:
Colorado-Big Thompson Project, Colorado. The Continental Divide Tunnel. Note the photo-electric cells of the block-signalling system which facilitates the movement of material trains and makes travel much safer in the construction of this major engineering feature. A man stands in the tunnel., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Boise Project, Idaho. Anderson Ranch Damsite. This earth-fill dam will have a power plant of 30,000 kilowatt capacity to help meet the power requirements in Idaho and Utah., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Boise Project, Idaho. Anderson Ranch Dam. Concrete lined tunnel under construction., 1942 March
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Tucumcari Project, New Mexico. The Conchas Canal winds through typical arid land to carry water from Conchas Dam to supply a great stock raising area in need of forage., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Tucumcari Project, New Mexico. Breaking new land for an experimental farm. The only clearing work required was partial burning of yucca. A worker pulls machinery through land using a tractor., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Altus Project, Oklahoma. Lugert Dike, one of the first feature of the Altus irrigation development in Oklahoma., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Provo River Project, Utah. Deer Creek Dam completed and storing water for agricultural and municipal use in an area where military concentrations and war industries are located., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Provo River Project, Utah. The Salt Lake Aqueduct now under construction. It will bring vitally needed additional water supplies to war industries in the Salt Lake City-Provo Area. A new steel plant will place a heavy drain on the inadequate supplies of the region where there is a rapidly increasing population due to military and war industrial activities., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Columbia Basin-Grand Coulee Dam Project, Washington. Grand Coulee Dam and power plant. Government camp in the foreground. The "left" wing of the power plant (at right) is complete; the "right" wing under construction., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Columbia Basin-Grand Coulee Dam Project, Washington. Grand Coulee Dam with left wing of power plant in foreground. Three large generators and two 20,000 station units are now in operation. Six other large generators are to be installed in 1943-1944. Two 75,000 kw. generators from Shasta Dam are to be in operation at Coulee in the Fall of 1942., undated
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.