Skip to main content

Bank Stabilization and Channel Rectification: Short Mountain Dam Site to Wilson Rock, Oklahoma, Arkansas River, 1955-06-30

 Item — Box: OS 1
Identifier: CAC_CC_031_14_0000_1_43
Bank Stabilization and Channel Rectification: Short Mountain Dam Site to Wilson Rock, Oklahoma, Arkansas River, 1955-06-30
Bank Stabilization and Channel Rectification: Short Mountain Dam Site to Wilson Rock, Oklahoma, Arkansas River, 1955-06-30

Scope and Contents

The document represents a plan area plan of the Bank Stabilization and Channel Rectification portion of the Arkansas River Basin's River and Harbor Project, which includes a vicinity map in the top, right corner. On reverse: Project. The bank stabilization and channel rectification in the reach between Short Mountain Dam site and Wilson Rock, Oklahoma, is an integral unit of the multiple-purpose plan authorized by the River and Harbor Act of July 24, 1946. Area plan (orthographic projection); 10 1/2 x 15 3/16 inches; Printed (top, right corner): 1; Inscribed (top, left corner): 50; Shading (red) south of the Arkansas River, north of 35 20N; Inscribed (right, center; red): [Last] floods cut thru Ox bow; Annotated (red) with an arrow pointing from words to area east of 94 40W and at 35 15N.

Dates

  • Creation: 1955-06-30

Creator

Language of Materials

From the Collection:

English

Conditions Governing Access:

Certain series of this collection are stored off-site and require prior notice to access. If you wish to view these materials, please contact the Congressional Archives staff to arrange an appointment.

The following series are stored off-site: Clippings and Invitations.

Full Extent

1 pages