Construction Needs at Riverside Indian School: Letter to Senator Bartlett, 1973-01-01 - 1973-12-31
Item — Box: 26, Folder: 21
Identifier: CAC_CC_009_1_26_21_0024
Scope and Contents
Preliminary plans are completed but if accelerated, construction would need to be finished by 1973. Funding for construction design and actual construction is being planned and will need to be completed within the next year.
Dates
- Creation: 1973-01-01 - 1973-12-31
Full Extent
1 Page
Language of Materials
From the Collection: English
Abstract
93rd (1973-1975)
Repository Details
Part of the Carl Albert Center Congressional and Political Collections Repository